Farm For Sale - QLD - Curra - 4570 - OVER 8 ACRES OF TRANQUIL COUNTRY LIVING
Photos17
Map
Floorplan

241 Cliff Jones Road, Curra QLD 4570

For Sale $850,000 Negotiable

3
1
Property Type
Other (Rural)
Land area approx
8.17ac
Curra241 Cliff Jones Road
3
1
8.17ac
For Sale $850,000 Negotiable
Google Maps

OVER 8 ACRES OF TRANQUIL COUNTRY LIVING

Set on just over 8 acres in the tranquil surrounds of Curra, 241 Cliff Jones Road presents a rare opportunity to secure a substantial parcel of land in a peaceful, private setting.

Located towards the end of a quiet no-through road, the property offers a wonderful sense of seclusion, with the home positioned well back from the road and surrounded by established, tranquil gardens. The property is also a haven for local wildlife, with regular visits from kangaroos, wallabies and an abundance of native birdlife.

As you enter the home, you are welcomed by a internal courtyard, complete with a covered atrium with landscaped, low-maintenance gardens. Inside, high ceilings create an open and airy atmosphere throughout the living, dining and kitchen spaces.

The spacious living and dining areas feature glass sliding doors that open onto the front concrete patio, creating a seamless connection between indoor and outdoor living. A fireplace in the living area provides a warm and inviting atmosphere during the cooler months, while the generous layout makes the home equally suited to relaxed family living and entertaining.

The kitchen is well positioned for entertaining, offering plenty of bench space, an original oven and stove, and a practical layout with room to make it your own.

Accommodation is thoughtfully positioned across the home. Two well-sized bedrooms are located to one side, with one featuring a built-in robe and desk. Privately positioned on the opposite side of the home, the main bedroom offers ample built-in wardrobes, in-wall air conditioning and excellent natural light.

The main bathroom includes a shower over bath, basin and vanity, while a separate toilet provides everyday convenience. A designated laundry area completes the home's practical features.

Outside, the property offers plenty of space to enjoy the acreage lifestyle, with a large dam providing an excellent water source for gardens and irrigation.

Properties offering this much land, privacy and tranquillity in Curra are increasingly hard to find. Whether you're looking for space, a peaceful rural lifestyle, room for gardens and wildlife, or simply an escape from the everyday, 241 Cliff Jones Road is a property worth discovering.

If peace, privacy and space are calling, contact Tim (0436 005 293) or Stella (0481 793 300) today.

N.B. Please do not enter any property without an agent present. All inspections by appointment only. Please phone or email Agent to arrange a viewing time.


DISCLAIMER:
" Whilst all due diligence has been taken in collecting and passing on the vendor supplied information, we do not accept responsibility for its accuracy and recommend intending purchasers/interested parties conduct and rely upon their own enquiries ".

Property Features

  • Air Conditioning
  • Built In Wardrobes
  • Open Fireplace
  • Outdoor Entertaining Area
  • Water Tank
Shop 1, Birdwood Drive Gunalda QLD 4570
Tim Broadbent -
Tim Broadbent
Stella Robertson -
Stella Robertson

Share This Property

More Other (Rural) Properties

207 Peacons Pocket Road, Tuchekoi QLD 4570
3
1
4
566600sqm
For Sale
New Listing! - Contact Agent
Upper Whitlow Road, Bingara NSW 2404
8
4
984ha
Expressions of Interest
Contact agent
Damien Crump - Crump Stock & Station Agency
Damien Crump
Crump Stock & Station Agency
Teelba QLD 4423
2964.73ha
Other (Rural)
For Sale
Contact agent
Clayton Smith - JLL Agribusiness
Clayton Smith
JLL Agribusiness
119 Christensens Road, Balberra QLD 4740
4
3
11
10.93ha
For Sale
$3,750,000
Peter Francis - Blacks Real Estate
Peter Francis
Blacks Real Estate
Yalca VIC 3637
236.50ha
Other (Rural)
For Sale
Contact agent
Jock Grimshaw - JLL Agribusiness
Jock Grimshaw
JLL Agribusiness
1139 Koondai-I Rd, Bunya Mountains QLD 4405
4
1
1
126.262ha
For Sale
Expression of Interest
John Malone - Nutrien Harcourts Dalby
John Malone
Nutrien Harcourts Dalby
There are 3094 more properties of this type. Find Other (Rural) Farms, Rural & Acreage Properties For Sale
Search Now

×
241 Cliff Jones Road, Curra For Sale by Farmbuy.com - image 1
241 Cliff Jones Road, Curra For Sale by Farmbuy.com - image 2
241 Cliff Jones Road, Curra For Sale by Farmbuy.com - image 3
241 Cliff Jones Road, Curra For Sale by Farmbuy.com - image 4
241 Cliff Jones Road, Curra For Sale by Farmbuy.com - image 5
241 Cliff Jones Road, Curra For Sale by Farmbuy.com - image 6
241 Cliff Jones Road, Curra For Sale by Farmbuy.com - image 7
241 Cliff Jones Road, Curra For Sale by Farmbuy.com - image 8
241 Cliff Jones Road, Curra For Sale by Farmbuy.com - image 9
241 Cliff Jones Road, Curra For Sale by Farmbuy.com - image 10
241 Cliff Jones Road, Curra For Sale by Farmbuy.com - image 11
241 Cliff Jones Road, Curra For Sale by Farmbuy.com - image 12
241 Cliff Jones Road, Curra For Sale by Farmbuy.com - image 13
241 Cliff Jones Road, Curra For Sale by Farmbuy.com - image 14
241 Cliff Jones Road, Curra For Sale by Farmbuy.com - image 15
241 Cliff Jones Road, Curra For Sale by Farmbuy.com - image 16
241 Cliff Jones Road, Curra For Sale by Farmbuy.com - image 17
241 Cliff Jones Road, Curra For Sale by Farmbuy.com - floorplan 1
×

Email a friend

You must be logged in and have a verified email address to use this feature.

×
Property Enquiry
×

Call Agent

×

Unlock the full farmbuy.com experience

You must be logged in and have a verified email address to use this feature.

Create an account

Have an account? Sign in